The Ram- and injection head is used in conjunction with the G¼" ram injection lance in slightly sandy soils for the purpose of sealing or consolidation. An enormous advantage of the Ram- and injection head is the possibility of flushing in during the ram injection process. In this way, the exit holes do not become clogged with the fine sand.
Work process
Connect ram lance with ram and injection head
Mount Geka coupling
Position the ram lance
Connect water until it emerges from transverse holes
Drive ram lance to desired depth (depths up to 3 m)
Connect the injection connection to material delivery line
Inject
After the injection process, pull the ram lance with ram and injection head out of the ground and clean it. For short lengths, it is possible to pull the ram injection lances manually by the handle.
Add Item to Shopping Basket
Add all selected Items to Shopping Basket
Remove Item from Shopping Basket
Add item to favorites
Remove Item from Favorites
Stock Outage Make a Preorder
Insufficient Stock
Item well stocked
Article in delivery
This item is part of a current campain
scroll top
Login to the online shop
Log in with your access data in the DESOI online shop. Please use your e-mail address and your password.
If you have forgotten your password, please click here.